Florida

FDOT announces Big Bend traffic advisory in the week of July 3

Drivers, along with Jackson County, encounter traffic obstacles on the following state roads in the Big Bend region as their crew engages in construction and maintenance activities.

From 8:00 am on Friday, July 1st to 11:59 pm on Monday, July 4th, in preparation for the Independence Day holiday weekend, lane closures and other activities that impede traffic on major state roads There is none.

Jackson County:

  • US231 Interstate 10 to US90 Resurfacing – From Tuesday, July 5th to Friday, July 8th, drivers will encounter intermittent lane changes due to striping operations.

All planned construction activities are weather dependent and may be rescheduled in bad weather. The driver should be careful to pay attention to the reduction of the speed limit when driving in the construction area.

Big bend
Franklin County:

  • US 319 Rehabilitation of the bridge over the Ochlockonee river bridge – On Wednesday, July 6, drivers will encounter intermittent lane closures due to pavement coring work.

Gadsden County:

  • Interstate 10 (I-10) Bridge rehabilitation Crooked Creek Bridge – – Driver encounters intermittent lane closure Tuesday, July 5th, 6pm to 6am.. For construction work. During this time, the speed limit drops to 60 mph.
  • Regular maintenance near US 27 (Florida Georgia Highway) 4th Street Southwest – The driver encounters a detour in the southbound portion of US 27 for road repairs from 8 pm to 6 am on Friday, July 8.

Leon County:

  • Resurfacing from South of US 319 (Thomasville Road) Maclay Road to Timberwolf Crossing – Driver encounters intermittent lane closure From Tuesday, July 5th to Thursday, July 7th, from 8pm to 6am for striping operations.
  • Installation of traffic lights at the intersection of State Highway (SR) 61 (Monroe Street) SR 20 (Appalachy Parkway) – Drivers encounter intermittent night lane closures, From Tuesday, July 5th to Thursday, July 7th for signaling work.
  • SR 61 (Monroe Street) Installation of traffic lights at Madison Street intersection – Drivers will encounter intermittent nighttime lane closures from Tuesday, July 5th to Thursday, July 7th due to signal processing.
  • Orange Avenue / Lake Bradford Road (SR 371) Rankin Avenue to Stadium Drive Resurfacing – Drivers may encounter intermittent lane closures on the next road.
  • Lake Bradford Road from Stadium Drive to Coleman Street (SR 366) heads north outside the lane. Tuesday, July 5th to Friday, July 8th Specific operation is from 8:00 am to 4:30 pm.
  • Lake Bradford Road from Coleman Street to Stadium Drive (SR 366) travels south outside the lane for pavement work from Tuesday, July 5th to Friday, July 8th, from 8am to 4:30 pm To do.

Wakulla County:

  • US98 Resurfacing from East of US 319 (Crawfordville Highway) to West of Wakura River Bridge – Drivers will encounter intermittent lane closures due to pavement work from Tuesday, July 5th to Friday, July 8th, from 7:30 am to 5:30 pm.



FDOT announces Big Bend traffic advisory in the week of July 3

Source link FDOT announces Big Bend traffic advisory in the week of July 3

Show More

Related Articles

Back to top button